Flow Ctrl Tech Engineering

District Cooling Plant: 20,000 TR Chiller Plant Optimization (CPO) Automation

Centralized 20,000 Ton-Refrigeration (TR) Chilled Water Plant in HVAC & Facilities: Low Delta-T syndrome across distribution piping forced excess chillers to operate at partial, inefficient loads. Manual chiller sequencing wasted megawatt-hours of electricity

  • Client Industry: HVAC & Facilities
  • Facility: Centralized 20,000 Ton-Refrigeration (TR) Chilled Water Plant
  • PLC System: Schneider Modicon Quantum / M580 PAC with dual Ethernet RIO heads
  • SCADA/HMI: Ignition SCADA platform with automated Coefficient of Performance (COP) and kW/TR efficiency dashboards
  • Protocols: BACnet/IP, Modbus TCP, Modbus RTU, OPC UA

Flow Ctrl Tech Engineering: Turnkey industrial automation, PLC programming, SCADA development, HMI, fieldbuses, and IIoT architectures. Contact our engineering center at [email protected] or phone +91 91110 91005.