- Closed-transition ATS allows testing generators under real facility load with zero power interruption.
- Paralleling switchgear synchronizes voltage, frequency, and phase angle across multiple generators before tying buses.
- The plant SCADA system enforces sequential 10-second staggered restarts on large pump VFDs to prevent generator stall.